01
Rapid production speed.
Smarter Steel Framing
Steel Framing and Modfloor Chassis Solutions Built to Last.
Our Capabilities
Explore the full WeFrameIT service range, from engineered steel framing to our famous Modfloor system.
About WeFrameIT
WeFrameIT now delivers fully transportable Modfloor chassis, along with engineered steel framing.
Backed by 100 combined years of steel industry knowledge, WeFrameIT brings innovative steel framing and Modfloor chassis systems to market, designed for strength, corrosion resistance, and fast installation.
Cost Saving Benefits
Exact manufacturing, lighter steel handling and moisture-resistant framing help projects move faster with less site friction.
01
Rapid production speed.
02
Fast and easy on-site installation.
03
Less wasted material because each piece is manufactured to exact specification.
04
Lighter frames than timber, making handling lighter and easier.
05
Design-led systems reduce the need for skilled labour on site.
06
Steel is superior to timber, both in ease of installation, better for flow-on trades and is termite proof.
Our 4 Step Process
A proven steel industry workflow now integrated into the WeFrameIT delivery model for faster, cleaner, and more efficient chassis and framing production.
Step One
Submit your PDF or DWG plans and our team converts them into a fully engineered 3D model so you can visualise how the modular base will look when assembled. Our engineers are licensed across Australian states to issue structural permits.
Step Two
Our 80% recycled steel is slit to precise thickness and width, then processed through the FRAMECAD FL650 rollformer, cut exactly to length and pre-punched with service holes and connection tabs to save time and cost.
Step Three
Once the light gauge steel joists and beams are produced, the perimeter beams are assembled with reusable lifting points and prepared for flat-pack shipping to your factory. A comprehensive manual is available to support assembly.
Step Four
South-east Queensland deliveries can be coordinated with crane-mounted trucks, and Australia-wide delivery can be arranged through independent transport contractors.
Independent Testing Proof
Testing evidence is central to how WeFrameIT differentiates. We provide the technical confidence needed for project approval and handover.
ZinMag ZM310 steel has been independently tested by a NATA laboratory to ASTM B117-19 for 2,000 hours with no rust or delamination, supporting harsh-environment project planning.
Deflection and structural performance testing confirms high-strength outcomes and helps reduce costly site rectification after delivery.
Contact
Share your scope and timeline. We will respond with the right framing and flooring pathway for your project.